A staggering P700t worth of materials has been spent on the 9th floor and much is very visible and which contributed to the 4% weighted development of the project. This excludes about the P400t which has been spent on labor (but much of that is on finishing)
Wall near the stair from 8th floor
Steelworks for the beam
Ingenious formworks
Many columns are up
See the invented clamps
Concrete ledges in lieu of polycarbonate for shade and sunlight protection