Linggo, Oktubre 13, 2013

Pictures of the development

A staggering P700t worth of materials has been spent on the 9th floor and much is very visible and which contributed to the 4% weighted development of the project.  This excludes about the P400t which has been spent on labor (but much of that is on finishing)

                                      Wall near the stair from 8th floor



                                           Steelworks for the beam

                                 Ingenious formworks

                                   Many columns are up

                                         See the invented clamps



                      Concrete ledges in lieu of polycarbonate for shade and sunlight protection